1990 | 1 | Co-gen Electricity | 9,727.42 |
1990 | 1 | Co-gen Steam | 7,086.18 |
1990 | 1 | Other On-Campus Stationary | 8,943.89 |
1990 | 1 | Direct Transportation | 528.62 |
1990 | 1 | Refrigerants & Chemicals | 145.93 |
1990 | 1 | Fertilizer & Animals | 4.88 |
1990 | 2 | Purchased Electricity | 9,024.86 |
1990 | 3 | Faculty Commuting | 2,774.18 |
1990 | 3 | Staff Commuting | 4,108.37 |
1990 | 3 | Student Commuting | 23,785.43 |
1990 | 3 | Directly Financed Air Travel | 8,233.36 |
1990 | 3 | Other Directly Financed Travel | 169.03 |
1990 | 3 | Solid Waste | 6,006.91 |
1990 | 3 | Wastewater | 178.93 |
1990 | 3 | T&D Losses | 892.57 |
1990 | 3 | FERA | 10,381.55 |
1991 | 1 | Co-gen Electricity | 9,439.52 |
1991 | 1 | Co-gen Steam | 6,876.46 |
1991 | 1 | Other On-Campus Stationary | 7,151.68 |
1991 | 1 | Direct Transportation | 528.87 |
1991 | 1 | Refrigerants & Chemicals | 145.93 |
1991 | 1 | Fertilizer & Animals | 4.88 |
1991 | 2 | Purchased Electricity | 9,045.40 |
1991 | 3 | Faculty Commuting | 2,812.33 |
1991 | 3 | Staff Commuting | 4,117.79 |
1991 | 3 | Student Commuting | 24,114.93 |
1991 | 3 | Directly Financed Air Travel | 8,297.52 |
1991 | 3 | Other Directly Financed Travel | 170.35 |
1991 | 3 | Solid Waste | 6,085.40 |
1991 | 3 | Wastewater | 181.26 |
1991 | 3 | T&D Losses | 894.60 |
1991 | 3 | FERA | 9,465.16 |
1992 | 1 | Co-gen Electricity | 6,664.71 |
1992 | 1 | Co-gen Steam | 4,855.08 |
1992 | 1 | Other On-Campus Stationary | 5,123.39 |
1992 | 1 | Direct Transportation | 529.17 |
1992 | 1 | Refrigerants & Chemicals | 145.93 |
1992 | 1 | Fertilizer & Animals | 4.88 |
1992 | 2 | Purchased Electricity | 9,283.88 |
1992 | 3 | Faculty Commuting | 2,835.49 |
1992 | 3 | Staff Commuting | 4,121.56 |
1992 | 3 | Student Commuting | 24,311.45 |
1992 | 3 | Directly Financed Air Travel | 8,335.70 |
1992 | 3 | Other Directly Financed Travel | 171.13 |
1992 | 3 | Solid Waste | 6,131.65 |
1992 | 3 | Wastewater | 182.65 |
1992 | 3 | T&D Losses | 918.19 |
1992 | 3 | FERA | 6,712.65 |
1993 | 1 | Co-gen Electricity | 5,752.30 |
1993 | 1 | Co-gen Steam | 4,190.41 |
1993 | 1 | Other On-Campus Stationary | 5,044.20 |
1993 | 1 | Direct Transportation | 529.46 |
1993 | 1 | Refrigerants & Chemicals | 145.93 |
1993 | 1 | Fertilizer & Animals | 4.88 |
1993 | 2 | Purchased Electricity | 10,596.05 |
1993 | 3 | Faculty Commuting | 2,621.57 |
1993 | 3 | Staff Commuting | 4,074.45 |
1993 | 3 | Student Commuting | 22,622.17 |
1993 | 3 | Directly Financed Air Travel | 7,978.99 |
1993 | 3 | Other Directly Financed Travel | 163.81 |
1993 | 3 | Solid Waste | 5,728.01 |
1993 | 3 | Wastewater | 170.63 |
1993 | 3 | T&D Losses | 1,047.96 |
1993 | 3 | FERA | 6,040.47 |
1994 | 1 | Co-gen Electricity | 6,442.36 |
1994 | 1 | Co-gen Steam | 4,693.10 |
1994 | 1 | Other On-Campus Stationary | 6,969.37 |
1994 | 1 | Direct Transportation | 529.67 |
1994 | 1 | Refrigerants & Chemicals | 145.93 |
1994 | 1 | Fertilizer & Animals | 4.88 |
1994 | 2 | Purchased Electricity | 9,622.35 |
1994 | 3 | Faculty Commuting | 2,387.21 |
1994 | 3 | Staff Commuting | 4,021.68 |
1994 | 3 | Student Commuting | 21,484.83 |
1994 | 3 | Directly Financed Air Travel | 7,588.87 |
1994 | 3 | Other Directly Financed Travel | 155.80 |
1994 | 3 | Solid Waste | 5,442.10 |
1994 | 3 | Wastewater | 162.08 |
1994 | 3 | T&D Losses | 951.66 |
1994 | 3 | FERA | 7,297.14 |
1995 | 1 | Co-gen Electricity | 6,433.99 |
1995 | 1 | Co-gen Steam | 4,687.00 |
1995 | 1 | Other On-Campus Stationary | 6,957.99 |
1995 | 1 | Direct Transportation | 529.73 |
1995 | 1 | Refrigerants & Chemicals | 145.93 |
1995 | 1 | Fertilizer & Animals | 4.88 |
1995 | 2 | Purchased Electricity | 11,153.52 |
1995 | 3 | Faculty Commuting | 2,407.65 |
1995 | 3 | Staff Commuting | 4,025.45 |
1995 | 3 | Student Commuting | 21,856.14 |
1995 | 3 | Directly Financed Air Travel | 7,622.98 |
1995 | 3 | Other Directly Financed Travel | 156.50 |
1995 | 3 | Solid Waste | 5,526.19 |
1995 | 3 | Wastewater | 164.59 |
1995 | 3 | T&D Losses | 1,103.10 |
1995 | 3 | FERA | 7,281.71 |
1996 | 1 | Co-gen Electricity | 6,997.77 |
1996 | 1 | Co-gen Steam | 5,097.70 |
1996 | 1 | Other On-Campus Stationary | 7,320.23 |
1996 | 1 | Direct Transportation | 529.66 |
1996 | 1 | Refrigerants & Chemicals | 145.93 |
1996 | 1 | Fertilizer & Animals | 4.88 |
1996 | 2 | Purchased Electricity | 12,210.02 |
1996 | 3 | Faculty Commuting | 2,490.76 |
1996 | 3 | Staff Commuting | 4,044.29 |
1996 | 3 | Student Commuting | 22,715.83 |
1996 | 3 | Directly Financed Air Travel | 7,761.42 |
1996 | 3 | Other Directly Financed Travel | 159.34 |
1996 | 3 | Solid Waste | 5,726.61 |
1996 | 3 | Wastewater | 170.58 |
1996 | 3 | T&D Losses | 1,207.58 |
1996 | 3 | FERA | 7,820.10 |
1997 | 1 | Co-gen Electricity | 9,651.49 |
1997 | 1 | Co-gen Steam | 7,030.87 |
1997 | 1 | Other On-Campus Stationary | 5,417.43 |
1997 | 1 | Direct Transportation | 529.30 |
1997 | 1 | Refrigerants & Chemicals | 145.93 |
1997 | 1 | Fertilizer & Animals | 4.88 |
1997 | 2 | Purchased Electricity | 11,793.26 |
1997 | 3 | Faculty Commuting | 2,543.90 |
1997 | 3 | Staff Commuting | 4,055.60 |
1997 | 3 | Student Commuting | 23,386.53 |
1997 | 3 | Directly Financed Air Travel | 7,850.74 |
1997 | 3 | Other Directly Financed Travel | 161.18 |
1997 | 3 | Solid Waste | 5,882.18 |
1997 | 3 | Wastewater | 175.20 |
1997 | 3 | T&D Losses | 1,166.37 |
1997 | 3 | FERA | 8,901.18 |
1998 | 1 | Co-gen Electricity | 11,240.63 |
1998 | 1 | Co-gen Steam | 8,188.52 |
1998 | 1 | Other On-Campus Stationary | 5,239.75 |
1998 | 1 | Direct Transportation | 529.06 |
1998 | 1 | Refrigerants & Chemicals | 145.93 |
1998 | 1 | Fertilizer & Animals | 4.88 |
1998 | 2 | Purchased Electricity | 12,060.07 |
1998 | 3 | Faculty Commuting | 2,595.68 |
1998 | 3 | Staff Commuting | 4,068.79 |
1998 | 3 | Student Commuting | 23,787.11 |
1998 | 3 | Directly Financed Air Travel | 7,937.37 |
1998 | 3 | Other Directly Financed Travel | 162.96 |
1998 | 3 | Solid Waste | 5,977.48 |
1998 | 3 | Wastewater | 178.05 |
1998 | 3 | T&D Losses | 1,192.75 |
1998 | 3 | FERA | 9,949.65 |
1999 | 1 | Co-gen Electricity | 9,847.97 |
1999 | 1 | Co-gen Steam | 7,174.00 |
1999 | 1 | Other On-Campus Stationary | 4,995.48 |
1999 | 1 | Direct Transportation | 528.79 |
1999 | 1 | Refrigerants & Chemicals | 145.93 |
1999 | 1 | Fertilizer & Animals | 4.88 |
1999 | 2 | Purchased Electricity | 14,030.79 |
1999 | 3 | Faculty Commuting | 2,669.26 |
1999 | 3 | Staff Commuting | 4,083.87 |
1999 | 3 | Student Commuting | 24,418.50 |
1999 | 3 | Directly Financed Air Travel | 8,059.10 |
1999 | 3 | Other Directly Financed Travel | 165.46 |
1999 | 3 | Solid Waste | 6,127.45 |
1999 | 3 | Wastewater | 182.51 |
1999 | 3 | T&D Losses | 1,387.66 |
1999 | 3 | FERA | 8,874.12 |
2000 | 1 | Co-gen Electricity | 10,196.33 |
2000 | 1 | Co-gen Steam | 7,427.78 |
2000 | 1 | Other On-Campus Stationary | 6,118.03 |
2000 | 1 | Direct Transportation | 528.23 |
2000 | 1 | Refrigerants & Chemicals | 145.93 |
2000 | 1 | Fertilizer & Animals | 4.88 |
2000 | 2 | Purchased Electricity | 14,145.23 |
2000 | 3 | Faculty Commuting | 2,665.17 |
2000 | 3 | Staff Commuting | 4,083.87 |
2000 | 3 | Student Commuting | 24,494.60 |
2000 | 3 | Directly Financed Air Travel | 8,053.44 |
2000 | 3 | Other Directly Financed Travel | 165.34 |
2000 | 3 | Solid Waste | 6,142.86 |
2000 | 3 | Wastewater | 182.98 |
2000 | 3 | T&D Losses | 1,398.98 |
2000 | 3 | FERA | 9,562.67 |
2001 | 1 | Co-gen Electricity | 4,040.89 |
2001 | 1 | Co-gen Steam | 2,943.69 |
2001 | 1 | Other On-Campus Stationary | 8,176.22 |
2001 | 1 | Direct Transportation | 527.41 |
2001 | 1 | Refrigerants & Chemicals | 145.93 |
2001 | 1 | Fertilizer & Animals | 4.88 |
2001 | 2 | Purchased Electricity | 20,000.12 |
2001 | 3 | Faculty Commuting | 2,682.88 |
2001 | 3 | Staff Commuting | 4,087.64 |
2001 | 3 | Student Commuting | 24,417.66 |
2001 | 3 | Directly Financed Air Travel | 8,081.19 |
2001 | 3 | Other Directly Financed Travel | 165.91 |
2001 | 3 | Solid Waste | 6,128.85 |
2001 | 3 | Wastewater | 182.57 |
2001 | 3 | T&D Losses | 1,978.03 |
2001 | 3 | FERA | 6,110.56 |
2002 | 1 | Co-gen Electricity | 12,236.45 |
2002 | 1 | Co-gen Steam | 8,913.95 |
2002 | 1 | Other On-Campus Stationary | 7,493.56 |
2002 | 1 | Direct Transportation | 526.67 |
2002 | 1 | Refrigerants & Chemicals | 145.93 |
2002 | 1 | Fertilizer & Animals | 4.88 |
2002 | 2 | Purchased Electricity | 14,525.00 |
2002 | 3 | Faculty Commuting | 2,899.53 |
2002 | 3 | Staff Commuting | 4,136.64 |
2002 | 3 | Student Commuting | 26,672.27 |
2002 | 3 | Directly Financed Air Travel | 8,443.85 |
2002 | 3 | Other Directly Financed Travel | 173.36 |
2002 | 3 | Solid Waste | 6,504.45 |
2002 | 3 | Wastewater | 198.27 |
2002 | 3 | T&D Losses | 1,436.54 |
2002 | 3 | FERA | 11,536.99 |
2003 | 1 | Co-gen Electricity | 25,485.32 |
2003 | 1 | Co-gen Steam | 18,565.43 |
2003 | 1 | Other On-Campus Stationary | 2,639.11 |
2003 | 1 | Direct Transportation | 525.89 |
2003 | 1 | Refrigerants & Chemicals | 145.93 |
2003 | 1 | Fertilizer & Animals | 4.88 |
2003 | 2 | Purchased Electricity | 2,933.49 |
2003 | 3 | Faculty Commuting | 2,910.43 |
2003 | 3 | Staff Commuting | 4,138.52 |
2003 | 3 | Student Commuting | 27,145.60 |
2003 | 3 | Directly Financed Air Travel | 8,462.67 |
2003 | 3 | Other Directly Financed Travel | 173.74 |
2003 | 3 | Solid Waste | 6,417.56 |
2003 | 3 | Wastewater | 201.39 |
2003 | 3 | T&D Losses | 290.13 |
2003 | 3 | FERA | 18,818.33 |
2004 | 1 | Co-gen Electricity | 26,038.51 |
2004 | 1 | Co-gen Steam | 18,968.42 |
2004 | 1 | Other On-Campus Stationary | 394.24 |
2004 | 1 | Direct Transportation | 524.76 |
2004 | 1 | Refrigerants & Chemicals | 145.93 |
2004 | 1 | Fertilizer & Animals | 4.88 |
2004 | 2 | Purchased Electricity | 388.20 |
2004 | 3 | Faculty Commuting | 2,857.29 |
2004 | 3 | Staff Commuting | 4,127.21 |
2004 | 3 | Student Commuting | 26,622.09 |
2004 | 3 | Directly Financed Air Travel | 8,373.78 |
2004 | 3 | Other Directly Financed Travel | 171.92 |
2004 | 3 | Solid Waste | 7,133.74 |
2004 | 3 | Wastewater | 197.74 |
2004 | 3 | T&D Losses | 38.39 |
2004 | 3 | FERA | 18,286.32 |
2005 | 1 | Co-gen Electricity | 26,013.35 |
2005 | 1 | Co-gen Steam | 18,950.08 |
2005 | 1 | Other On-Campus Stationary | 3,470.40 |
2005 | 1 | Direct Transportation | 523.64 |
2005 | 1 | Refrigerants & Chemicals | 145.93 |
2005 | 1 | Fertilizer & Animals | 4.88 |
2005 | 2 | Purchased Electricity | 2,472.57 |
2005 | 3 | Faculty Commuting | 2,793.25 |
2005 | 3 | Staff Commuting | 4,100.83 |
2005 | 3 | Student Commuting | 26,152.94 |
2005 | 3 | Directly Financed Air Travel | 8,253.60 |
2005 | 3 | Other Directly Financed Travel | 169.45 |
2005 | 3 | Solid Waste | 7,876.54 |
2005 | 3 | Wastewater | 194.33 |
2005 | 3 | T&D Losses | 244.54 |
2005 | 3 | FERA | 19,521.24 |
2006 | 1 | Co-gen Electricity | 28,546.66 |
2006 | 1 | Co-gen Steam | 20,795.54 |
2006 | 1 | Other On-Campus Stationary | 4,164.23 |
2006 | 1 | Direct Transportation | 522.16 |
2006 | 1 | Refrigerants & Chemicals | 145.93 |
2006 | 1 | Fertilizer & Animals | 4.88 |
2006 | 2 | Purchased Electricity | 3,213.09 |
2006 | 3 | Faculty Commuting | 2,559.91 |
2006 | 3 | Staff Commuting | 4,156.33 |
2006 | 3 | Student Commuting | 23,729.80 |
2006 | 3 | Directly Financed Air Travel | 8,240.07 |
2006 | 3 | Other Directly Financed Travel | 169.17 |
2006 | 3 | Solid Waste | 7,767.22 |
2006 | 3 | Wastewater | 194.69 |
2006 | 3 | T&D Losses | 317.78 |
2006 | 3 | FERA | 21,565.75 |
2007 | 1 | Co-gen Electricity | 29,185.79 |
2007 | 1 | Co-gen Steam | 21,080.96 |
2007 | 1 | Other On-Campus Stationary | 4,734.07 |
2007 | 1 | Direct Transportation | 520.99 |
2007 | 1 | Refrigerants & Chemicals | 145.93 |
2007 | 1 | Fertilizer & Animals | 4.88 |
2007 | 2 | Purchased Electricity | 3,024.74 |
2007 | 3 | Faculty Commuting | 2,384.77 |
2007 | 3 | Staff Commuting | 4,167.29 |
2007 | 3 | Student Commuting | 24,941.84 |
2007 | 3 | Directly Financed Air Travel | 7,992.71 |
2007 | 3 | Other Directly Financed Travel | 164.09 |
2007 | 3 | Solid Waste | 7,739.19 |
2007 | 3 | Wastewater | 202.61 |
2007 | 3 | T&D Losses | 299.15 |
2007 | 3 | FERA | 22,168.06 |
2008 | 1 | Co-gen Electricity | 28,619.63 |
2008 | 1 | Co-gen Steam | 20,246.89 |
2008 | 1 | Other On-Campus Stationary | 6,567.47 |
2008 | 1 | Direct Transportation | 519.84 |
2008 | 1 | Refrigerants & Chemicals | 145.93 |
2008 | 1 | Fertilizer & Animals | 4.88 |
2008 | 2 | Purchased Electricity | 6,063.37 |
2008 | 3 | Faculty Commuting | 2,449.29 |
2008 | 3 | Staff Commuting | 3,721.51 |
2008 | 3 | Student Commuting | 26,726.21 |
2008 | 3 | Directly Financed Air Travel | 7,612.09 |
2008 | 3 | Other Directly Financed Travel | 156.28 |
2008 | 3 | Solid Waste | 6,522.67 |
2008 | 3 | Wastewater | 204.95 |
2008 | 3 | T&D Losses | 599.67 |
2008 | 3 | FERA | 22,342.65 |
2009 | 1 | Co-gen Electricity | 28,322.33 |
2009 | 1 | Co-gen Steam | 20,495.73 |
2009 | 1 | Other On-Campus Stationary | 4,731.74 |
2009 | 1 | Direct Transportation | 518.99 |
2009 | 1 | Refrigerants & Chemicals | 145.93 |
2009 | 1 | Fertilizer & Animals | 4.88 |
2009 | 2 | Purchased Electricity | 5,214.57 |
2009 | 3 | Faculty Commuting | 2,537.52 |
2009 | 3 | Staff Commuting | 3,858.53 |
2009 | 3 | Student Commuting | 26,368.12 |
2009 | 3 | Directly Financed Air Travel | 7,889.32 |
2009 | 3 | Other Directly Financed Travel | 161.97 |
2009 | 3 | Solid Waste | 4,410.58 |
2009 | 3 | Wastewater | 229.65 |
2009 | 3 | T&D Losses | 515.73 |
2009 | 3 | FERA | 21,568.37 |
2010 | 1 | Co-gen Electricity | 27,816.48 |
2010 | 1 | Co-gen Steam | 20,563.08 |
2010 | 1 | Other On-Campus Stationary | 4,667.35 |
2010 | 1 | Direct Transportation | 517.99 |
2010 | 1 | Refrigerants & Chemicals | 145.93 |
2010 | 1 | Fertilizer & Animals | 4.88 |
2010 | 2 | Purchased Electricity | 5,053.05 |
2010 | 3 | Faculty Commuting | 2,014.74 |
2010 | 3 | Staff Commuting | 3,801.90 |
2010 | 3 | Student Commuting | 24,822.98 |
2010 | 3 | Directly Financed Air Travel | 7,051.91 |
2010 | 3 | Other Directly Financed Travel | 144.78 |
2010 | 3 | Solid Waste | 3,323.00 |
2010 | 3 | Wastewater | 191.08 |
2010 | 3 | T&D Losses | 371.01 |
2010 | 3 | FERA | 21,351.11 |
2011 | 1 | Co-gen Electricity | 27,353.94 |
2011 | 1 | Co-gen Steam | 20,206.67 |
2011 | 1 | Other On-Campus Stationary | 3,940.44 |
2011 | 1 | Direct Transportation | 517.19 |
2011 | 1 | Refrigerants & Chemicals | 145.93 |
2011 | 1 | Fertilizer & Animals | 4.88 |
2011 | 2 | Purchased Electricity | 4,110.56 |
2011 | 3 | Faculty Commuting | 1,931.78 |
2011 | 3 | Staff Commuting | 3,705.07 |
2011 | 3 | Student Commuting | 22,434.48 |
2011 | 3 | Directly Financed Air Travel | 6,827.15 |
2011 | 3 | Other Directly Financed Travel | 140.16 |
2011 | 3 | Solid Waste | 3,359.44 |
2011 | 3 | Wastewater | 161.82 |
2011 | 3 | T&D Losses | 301.81 |
2011 | 3 | FERA | 20,728.90 |
2012 | 1 | Co-gen Electricity | 27,383.95 |
2012 | 1 | Co-gen Steam | 19,824.63 |
2012 | 1 | Other On-Campus Stationary | 3,141.74 |
2012 | 1 | Direct Transportation | 516.39 |
2012 | 1 | Refrigerants & Chemicals | 145.93 |
2012 | 1 | Fertilizer & Animals | 4.88 |
2012 | 2 | Purchased Electricity | 3,851.84 |
2012 | 3 | Faculty Commuting | 1,913.34 |
2012 | 3 | Staff Commuting | 3,734.30 |
2012 | 3 | Student Commuting | 23,426.98 |
2012 | 3 | Directly Financed Air Travel | 6,829.57 |
2012 | 3 | Other Directly Financed Travel | 140.21 |
2012 | 3 | Solid Waste | 3,516.41 |
2012 | 3 | Wastewater | 164.07 |
2012 | 3 | T&D Losses | 235.58 |
2012 | 3 | FERA | 20,279.70 |
2013 | 1 | Co-gen Electricity | 26,306.79 |
2013 | 1 | Co-gen Steam | 19,464.95 |
2013 | 1 | Other On-Campus Stationary | 4,150.94 |
2013 | 1 | Direct Transportation | 537.03 |
2013 | 1 | Refrigerants & Chemicals | 145.93 |
2013 | 1 | Fertilizer & Animals | 4.88 |
2013 | 2 | Purchased Electricity | 4,022.18 |
2013 | 3 | Faculty Commuting | 1,804.05 |
2013 | 3 | Staff Commuting | 3,907.86 |
2013 | 3 | Student Commuting | 25,541.85 |
2013 | 3 | Directly Financed Air Travel | 6,853.53 |
2013 | 3 | Other Directly Financed Travel | 140.71 |
2013 | 3 | Solid Waste | 3,562.66 |
2013 | 3 | Wastewater | 186.11 |
2013 | 3 | T&D Losses | 246.00 |
2013 | 3 | FERA | 20,121.32 |
2014 | 1 | Co-gen Electricity | 26,884.26 |
2014 | 1 | Co-gen Steam | 19,687.67 |
2014 | 1 | Other On-Campus Stationary | 3,560.88 |
2014 | 1 | Direct Transportation | 450.67 |
2014 | 1 | Refrigerants & Chemicals | 145.93 |
2014 | 1 | Fertilizer & Animals | 4.88 |
2014 | 2 | Purchased Electricity | 3,111.31 |
2014 | 3 | Faculty Commuting | 2,085.23 |
2014 | 3 | Staff Commuting | 3,958.01 |
2014 | 3 | Student Commuting | 25,838.03 |
2014 | 3 | Directly Financed Air Travel | 7,142.53 |
2014 | 3 | Other Directly Financed Travel | 151.87 |
2014 | 3 | Solid Waste | 3,338.42 |
2014 | 3 | Wastewater | 205.22 |
2014 | 3 | T&D Losses | 156.53 |
2014 | 3 | FERA | 20,219.94 |
2015 | 1 | Co-gen Electricity | 28,065.92 |
2015 | 1 | Co-gen Steam | 20,410.29 |
2015 | 1 | Other On-Campus Stationary | 3,878.89 |
2015 | 1 | Direct Transportation | 584.85 |
2015 | 1 | Refrigerants & Chemicals | 145.93 |
2015 | 1 | Fertilizer & Animals | 4.88 |
2015 | 2 | Purchased Electricity | 3,217.92 |
2015 | 3 | Faculty Commuting | 2,147.20 |
2015 | 3 | Staff Commuting | 3,722.85 |
2015 | 3 | Student Commuting | 27,346.88 |
2015 | 3 | Directly Financed Air Travel | 6,604.38 |
2015 | 3 | Other Directly Financed Travel | 148.74 |
2015 | 3 | Solid Waste | 3,115.58 |
2015 | 3 | Wastewater | 185.34 |
2015 | 3 | T&D Losses | 161.89 |
2015 | 3 | FERA | 21,131.91 |
2016 | 1 | Co-gen Electricity | 26,387.85 |
2016 | 1 | Co-gen Steam | 18,305.67 |
2016 | 1 | Other On-Campus Stationary | 2,878.91 |
2016 | 1 | Direct Transportation | 490.23 |
2016 | 1 | Refrigerants & Chemicals | 145.93 |
2016 | 1 | Fertilizer & Animals | 4.88 |
2016 | 2 | Purchased Electricity | 3,045.62 |
2016 | 3 | Faculty Commuting | 2,132.16 |
2016 | 3 | Staff Commuting | 3,801.17 |
2016 | 3 | Student Commuting | 27,976.59 |
2016 | 3 | Directly Financed Air Travel | 6,660.94 |
2016 | 3 | Other Directly Financed Travel | 150.02 |
2016 | 3 | Solid Waste | 3,076.34 |
2016 | 3 | Wastewater | 168.91 |
2016 | 3 | T&D Losses | 134.52 |
2016 | 3 | FERA | 19,213.78 |
2017 | 1 | Co-gen Electricity | 20,871.61 |
2017 | 1 | Co-gen Steam | 14,305.50 |
2017 | 1 | Other On-Campus Stationary | 3,714.61 |
2017 | 1 | Direct Transportation | 484.46 |
2017 | 1 | Refrigerants & Chemicals | 145.93 |
2017 | 1 | Fertilizer & Animals | 4.88 |
2017 | 2 | Purchased Electricity | 7,662.93 |
2017 | 3 | Faculty Commuting | 2,610.04 |
2017 | 3 | Staff Commuting | 5,230.85 |
2017 | 3 | Student Commuting | 37,658.70 |
2017 | 3 | Directly Financed Air Travel | 7,294.04 |
2017 | 3 | Other Directly Financed Travel | 233.43 |
2017 | 3 | Solid Waste | 3,329.10 |
2017 | 3 | Wastewater | 159.36 |
2017 | 3 | T&D Losses | 338.46 |
2017 | 3 | FERA | 15,707.78 |
2018 | 1 | Co-gen Electricity | 21,055.11 |
2018 | 1 | Co-gen Steam | 16,223.19 |
2018 | 1 | Other On-Campus Stationary | 3,899.82 |
2018 | 1 | Direct Transportation | 483.81 |
2018 | 1 | Refrigerants & Chemicals | 145.93 |
2018 | 1 | Fertilizer & Animals | 4.88 |
2018 | 2 | Purchased Electricity | 6,804.85 |
2018 | 3 | Faculty Commuting | 3,368.90 |
2018 | 3 | Staff Commuting | 5,152.73 |
2018 | 3 | Student Commuting | 25,115.72 |
2018 | 3 | Directly Financed Air Travel | 6,537.90 |
2018 | 3 | Other Directly Financed Travel | 228.54 |
2018 | 3 | Solid Waste | 4,335.46 |
2018 | 3 | Wastewater | 164.27 |
2018 | 3 | T&D Losses | 343.44 |
2018 | 3 | FERA | 16,631.22 |
2019 | 1 | Co-gen Electricity | 20,256.56 |
2019 | 1 | Co-gen Steam | 16,830.05 |
2019 | 1 | Other On-Campus Stationary | 4,098.21 |
2019 | 1 | Direct Transportation | 478.22 |
2019 | 1 | Refrigerants & Chemicals | 145.93 |
2019 | 1 | Fertilizer & Animals | 4.88 |
2019 | 2 | Purchased Electricity | 4,714.64 |
2019 | 3 | Faculty Commuting | 3,715.48 |
2019 | 3 | Staff Commuting | 4,814.81 |
2019 | 3 | Student Commuting | 28,807.53 |
2019 | 3 | Directly Financed Air Travel | 6,537.90 |
2019 | 3 | Other Directly Financed Travel | 228.54 |
2019 | 3 | Solid Waste | 8,465.97 |
2019 | 3 | Wastewater | 163.85 |
2019 | 3 | T&D Losses | 253.37 |
2019 | 3 | FERA | 16,633.92 |
2020 | 1 | Co-gen Electricity | 17,462.31 |
2020 | 1 | Co-gen Steam | 14,526.83 |
2020 | 1 | Other On-Campus Stationary | 3,288.54 |
2020 | 1 | Direct Transportation | 364.43 |
2020 | 1 | Refrigerants & Chemicals | 157.84 |
2020 | 1 | Fertilizer & Animals | 4.88 |
2020 | 2 | Purchased Electricity | 5,883.89 |
2020 | 3 | Faculty Commuting | 1,680.10 |
2020 | 3 | Staff Commuting | 2,609.22 |
2020 | 3 | Student Commuting | 16,057.63 |
2020 | 3 | Directly Financed Air Travel | 4,686.21 |
2020 | 3 | Other Directly Financed Travel | 168.86 |
2020 | 3 | Solid Waste | 2,956.49 |
2020 | 3 | Wastewater | 158.05 |
2020 | 3 | T&D Losses | 329.30 |
2020 | 3 | FERA | 14,248.12 |
2021 | 1 | Co-gen Electricity | 22,979.69 |
2021 | 1 | Co-gen Steam | 16,455.82 |
2021 | 1 | Other On-Campus Stationary | 4,135.43 |
2021 | 1 | Direct Transportation | 394.27 |
2021 | 1 | Refrigerants & Chemicals | 177.56 |
2021 | 1 | Fertilizer & Animals | 4.88 |
2021 | 2 | Purchased Electricity | 4,429.27 |
2021 | 3 | Faculty Commuting | 856.04 |
2021 | 3 | Staff Commuting | 1,366.22 |
2021 | 3 | Student Commuting | 8,296.95 |
2021 | 3 | Directly Financed Air Travel | 1,496.65 |
2021 | 3 | Other Directly Financed Travel | 56.85 |
2021 | 3 | Solid Waste | 918.04 |
2021 | 3 | Wastewater | 136.96 |
2021 | 3 | T&D Losses | 203.86 |
2021 | 3 | FERA | 17,597.64 |
2022 | 1 | Co-gen Electricity | 28,044.53 |
2022 | 1 | Co-gen Steam | 16,960.86 |
2022 | 1 | Other On-Campus Stationary | 5,412.50 |
2022 | 1 | Direct Transportation | 471.90 |
2022 | 1 | Refrigerants & Chemicals | 189.88 |
2022 | 1 | Fertilizer & Animals | 4.88 |
2022 | 2 | Purchased Electricity | 2,787.17 |
2022 | 3 | Faculty Commuting | 2,994.75 |
2022 | 3 | Staff Commuting | 4,524.73 |
2022 | 3 | Student Commuting | 20,866.95 |
2022 | 3 | Directly Financed Air Travel | 6,015.64 |
2022 | 3 | Other Directly Financed Travel | 223.91 |
2022 | 3 | Solid Waste | 2,415.38 |
2022 | 3 | Wastewater | 153.78 |
2022 | 3 | T&D Losses | 149.78 |
2022 | 3 | FERA | 20,363.02 |